Supply Date05 Nov 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35
Freight18.44
Loading Charges0
Offloading Charges0
Royalty7.18
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4606.7
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.70
Fe3.95
SiO213.00
Al2O33.51
P0.09
Size 0-10MM2.6
Size 10-20MM2.5
Size 20-100MM27.80
Size +100MM67.10
MOISTURE0.66