Supply Date31 Oct 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity32.04
Freight23.14
Loading Charges0
Offloading Charges0
Royalty7.31
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3891.26
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.05
Fe3.70
SiO29.20
Al2O33.61
P0.10
Size 0-10MM3.10
Size 10-20MM2.50
Size 20-100MM24.50
Size +100MM69.90
MOISTURE0.60