Supply Date31 Oct 2021
Contract NumberSAFAL/P/MN ORE/06.25/2021
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity29.36
Freight30.45
Loading Charges5.81
Offloading Charges0
Royalty7.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3379.63
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.85
Fe2.06
SiO29.50
Al2O31.39
P0.12
Size 0-10MM1.5
Size 10-20MM1.2
Size 20-100MM21.80
Size +100MM75.50
MOISTURE0.80