Supply Date29 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity31.6
Freight19.18
Loading Charges0
Offloading Charges0
Royalty6.72
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4168.04
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.03
Fe3.84
SiO210.62
Al2O34.89
P0.120
Size 0-10MM7.28
Size 10-20MM2.95
Size 20-100MM62.21
Size +100MM27.56
MOISTURE0.78