Supply Date31 Oct 2019
Contract NumberOS/MN ORE/41/2019
ItemManganese Ore
Supplier NameJAZZMAN MN ORE
Grade (%)Low (32% - 38%)
Lot NumberJAZZMAN 30% Mn ore
Deviance0
Inward Quantity65.219
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2370.88
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-9 of 9 items.
Raw Material ComponentValue
Mn28.5
Fe14.5
SiO210.1
Al2O33.9
P0.31
Size 0-10MM10-100mm
Size 10-20MM-
Size 20-100MM-
Size +100MM-