Supply Date26 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity40.7
Freight20.43
Loading Charges0
Offloading Charges0
Royalty7.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5453.8
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.40
Fe2.57
SiO211.50
Al2O33.01
P0.11
Size 0-10MM1.62
Size 10-20MM2.50
Size 20-100MM46.98
Size +100MM48.90
MOISTURE0.50