Supply Date26 Oct 2021
Contract NumberSAFAL/P/MN ORE/10.02/2021
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)High (44% - 50%)
Lot NumberJIANFEL WU
Deviance0
Inward Quantity40.92
Freight24
Loading Charges0
Offloading Charges0
Royalty7.01
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5197.25
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn48.05
Fe5.24
SiO26.95
Al2O32.64
P0.115
Size 0-10MM1.21
Size 10-20MM1.57
Size 20-100MM31.14
Size +100MM66.08
MOISTURE1.08