Supply Date23 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity33.84
Freight20.43
Loading Charges0
Offloading Charges0
Royalty7.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4534.56
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.95
Fe4.22
SiO212.94
Al2O33.85
P0.14
Size 0-10MM5.94
Size 10-20MM4.77
Size 20-100MM58.45
Size +100MM30.84
MOISTURE0.92