Supply Date15 Oct 2021
Contract NumberSAFAL/P/MN ORE/10.02/2021
ItemManganese Ore
Supplier NameJIANFEL WU
Grade (%)High (44% - 50%)
Lot NumberJIANFEL WU
Deviance0
Inward Quantity52
Freight24
Loading Charges0
Offloading Charges0
Royalty7.91
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6651.32
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.04
Fe1.98
SiO27.24
Al2O33.25
P0.10
Size 0-10MM1.79
Size 10-20MM1.54
Size 20-100MM59.25
Size +100MM37.42
MOISTURE0.89