Supply Date18 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity36.44
Freight20.43
Loading Charges0
Offloading Charges0
Royalty7.31
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4873.49
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.08
Fe3.37
SiO29.59
Al2O33.52
P0.12
Size 0-10MM3.75
Size 10-20MM2.92
Size 20-100MM60.90
Size +100MM32.43
MOISTURE0.82