Supply Date17 Oct 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity36.14
Freight24.64
Loading Charges0
Offloading Charges0
Royalty7.02
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4432.93
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.10
Fe2.26
SiO29.82
Al2O32.82
P0.129
Size 0-10MM3.87
Size 10-20MM2.92
Size 20-100MM60.42
Size +100MM32.79
MOISTURE0.69