Supply Date17 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity32.3
Freight20.43
Loading Charges0
Offloading Charges0
Royalty7.34
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4320.77
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.18
Fe2.50
SiO29.60
Al2O33.50
P0.120
Size 0-10MM2.40
Size 10-20MM3.71
Size 20-100MM64.17
Size +100MM29.72
MOISTURE0.77