Supply Date15 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.34
Freight22.7
Loading Charges0
Offloading Charges0
Royalty6.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4648.95
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.89
Fe4.85
SiO212.59
Al2O33.41
P0.14
Size 0-10MM2.97
Size 10-20MM2.84
Size 20-100MM57.31
Size +100MM36.88
MOISTURE0.89