Supply Date13 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.04
Freight22.7
Loading Charges0
Offloading Charges0
Royalty7.47
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4635.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.60
Fe2.10
SiO29.20
Al2O32.40
P0.11
Size 0-10MM2.60
Size 10-20MM2.5
Size 20-100MM69.88
Size +100MM25.02
MOISTURE0.40