Supply Date08 Oct 2021
Contract NumberSAFAL/P/MN ORE/10.01/2021
ItemManganese Ore
Supplier NameKASONTA RESOURCES LTD
Grade (%)Medium (38% - 44%)
Lot NumberKASONTA RESOURCES-GRADE 40% TO 42%
Deviance0
Inward Quantity36.24
Freight13.62
Loading Charges0
Offloading Charges0
Royalty4.57
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2145.05
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.79
Fe4.15
SiO213.99
Al2O38.05
P0.165
Size 0-10MM10.24
Size 10-20MM8.35
Size 20-100MM62.15
Size +100MM19.26
MOISTURE1.18