Supply Date28 Sep 2021
Contract NumberSAFAL/P/MN ORE/10.01/2021
ItemManganese Ore
Supplier NameKASONTA RESOURCES LTD
Grade (%)Medium (38% - 44%)
Lot NumberKASONTA RESOURCES-GRADE 40% TO 42%
Deviance0
Inward Quantity29.205
Freight12.11
Loading Charges0
Offloading Charges0
Royalty5.1
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1670.82
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.37
Fe2.67
SiO211.62
Al2O38.12
P0.17
Size 0-10MM3.20
Size 10-20MM4.81
Size 20-100MM66.49
Size +100MM25.50
MOISTURE1.12