Supply Date07 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity30.345
Freight22.7
Loading Charges0
Offloading Charges0
Royalty8.2
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4154.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.96
Fe3.28
SiO28.27
Al2O32.19
P0.105
Size 0-10MM1.02
Size 10-20MM1.16
Size 20-100MM61.38
Size +100MM36.44
MOISTURE0.80