Supply Date04 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.265
Freight22.7
Loading Charges0
Offloading Charges0
Royalty7.92
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5091.14
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.08
Fe2.75
SiO28.60
Al2O32.16
P0.110
Size 0-10MM2.85
Size 10-20MM2.60
Size 20-100MM63.31
Size +100MM31.24
MOISTURE0.92