Supply Date02 Oct 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.635
Freight22.7
Loading Charges0
Offloading Charges0
Royalty7.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4722.48
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.68
Fe2.46
SiO28.55
Al2O32.46
P0.105
Size 0-10MM3.78
Size 10-20MM2.46
Size 20-100MM61.07
Size +100MM32.69
MOISTURE1.46