Supply Date28 Sep 2021
Contract NumberSAFAL/P/MN ORE/09.2/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity34.38
Freight20.18
Loading Charges0
Offloading Charges-5
Royalty7.83
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4435.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.81
Fe1.59
SiO27.61
Al2O32.38
P0.11
Size 0-10MM3.1
Size 10-20MM2.05
Size 20-100MM59.25
Size +100MM35.61
MOISTURE0.66