Supply Date23 Sep 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity36.7
Freight21.91
Loading Charges0
Offloading Charges0
Royalty8.24
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4446.21
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn52.60
Fe2.45
SiO27.96
Al2O33.28
P0.110
Size 0-10MM1.85
Size 10-20MM1.67
Size 20-100MM29.22
Size +100MM67.26
MOISTURE0.96