Supply Date22 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.975
Freight20.18
Loading Charges0
Offloading Charges0
Royalty7.83
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4641.13
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.84
Fe2.08
SiO29.83
Al2O32.98
P0.105
Size 0-10MM3.84
Size 10-20MM2.56
Size 20-100MM63.44
Size +100MM30.16
MOISTURE0.94