Supply Date19 Sep 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity31.425
Freight23.06
Loading Charges0
Offloading Charges0
Royalty7.96
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3834.48
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.67
Fe3.83
SiO27.68
Al2O32.79
P0.110
Size 0-10MM1.0.9
Size 10-20MM2.04
Size 20-100MM69.79
Size +100MM27.08
MOISTURE0.90