Supply Date14 Nov 2021
Contract NumberSAFAL/P/MN ORE/11.3/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity38.82
Freight20.48
Loading Charges0
Offloading Charges0
Royalty7.59
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5204.6
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.60
Fe3.75
SiO27.90
Al2O33.18
P0.110
Size 0-10MM1.47
Size 10-20MM1.97
Size 20-100MM67.21
Size +100MM29.35
MOISTURE1.18