Supply Date02 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity33.405
Freight20.18
Loading Charges0
Offloading Charges0
Royalty7.89
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4311.58
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.45
Fe2.64
SiO28.24
Al2O33.28
P0.115
Size 0-10MM2.57
Size 10-20MM2.12
Size 20-100MM63.73
Size +100MM31.58
MOISTURE1.06