Supply Date02 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity41.595
Freight20.18
Loading Charges0
Offloading Charges0
Royalty7.83
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5366.17
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.67
Fe2.15
SiO27.57
Al2O33.64
P0.115
Size 0-10MM2.69
Size 10-20MM2.40
Size 20-100MM68.10
Size +100MM26.81
MOISTURE1.08