Supply Date02 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity38.815
Freight21.91
Loading Charges0
Offloading Charges0
Royalty7.82
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5074.28
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.22
Fe2.97
SiO28.05
Al2O32.46
P0.110
Size 0-10MM2.45
Size 10-20MM1.76
Size 20-100MM65.15
Size +100MM30.64
MOISTURE1.05