Supply Date05 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity29.35
Freight25.48
Loading Charges0
Offloading Charges0
Royalty7.83
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3942
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.37
Fe2.55
SiO28.52
Al2O33.60
P0.125
Size 0-10MM2.05
Size 10-20MM1.15
Size 20-100MM66.71
Size +100MM30.09
MOISTURE1.08