Supply Date04 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity37.59
Freight20.18
Loading Charges0
Offloading Charges0
Royalty7.83
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4849.49
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.69
Fe2.68
SiO28.40
Al2O33.60
P0.115
Size 0-10MM2.37
Size 10-20MM1.95
Size 20-100MM61.46
Size +100MM34.22
MOISTURE0.99