Supply Date31 Aug 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.575
Freight16.62
Loading Charges0
Offloading Charges0
Royalty7.74
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4459.68
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.98
Fe2.44
SiO27.85
Al2O32.47
P0.110
Size 0-10MM2.02
Size 10-20MM1.95
Size 20-100MM63.69
Size +100MM32.34
MOISTURE0.89