Supply Date03 Sep 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity29.69
Freight25.48
Loading Charges0
Offloading Charges0
Royalty7.83
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3987.66
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.60
Fe3.05
SiO28.09
Al2O32.78
P0.115
Size 0-10MM1.57
Size 10-20MM1.91
Size 20-100MM62.44
Size +100MM34.08
MOISTURE1.35