Supply Date30 Aug 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.1
Freight16.615
Loading Charges0
Offloading Charges0
Royalty7.54
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4392.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.14
Fe3.68
SiO27.99
Al2O33.76
P0.110
Size 0-10MM2.08
Size 10-20MM1.49
Size 20-100MM61.46
Size +100MM34.97
MOISTURE1.09