Supply Date29 Aug 2021
Contract NumberSAFAL/P/MN ORE/06.25/2021
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity31.515
Freight23.736
Loading Charges0
Offloading Charges0
Royalty7.04
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost3175.96
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.29
Fe2.69
SiO27.97
Al2O34.10
P0.130
Size 0-10MM4.80
Size 10-20MM2.95
Size 20-100MM51.07
Size +100MM41.18
MOISTURE0.98