Supply Date29 Aug 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity42.82
Freight16.615
Loading Charges0
Offloading Charges0
Royalty6.04
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost5252.09
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.06
Fe2.44
SiO28.72
Al2O33.75
P0.115
Size 0-10MM2.16
Size 10-20MM1.95
Size 20-100MM68.55
Size +100MM27.34
MOISTURE0.94