Supply Date27 Aug 2021
Contract NumberSAFAL/P/MN ORE/08.1/2021
ItemManganese Ore
Supplier NameSPRING GARDEN INVESTMENT LTD
Grade (%)High (44% - 50%)
Lot NumberSPRING GARDEN MN ORE GRADE 48%
Deviance0
Inward Quantity35.31
Freight16.615
Loading Charges0
Offloading Charges0
Royalty6.04
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4366.26
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.74
Fe2.38
SiO28.74
Al2O32.44
P0.115
Size 0-10MM3.02
Size 10-20MM1.08
Size 20-100MM32.70
Size +100MM63.20
MOISTURE0.115