Supply Date21 Aug 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity38.465
Freight16.615
Loading Charges0
Offloading Charges0
Royalty6.04
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4371.74
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.89
Fe1.68
SiO28.37
Al2O32.05
P0.10
Size 0-10MM1.92
Size 10-20MM1.16
Size 20-100MM64.02
Size +100MM32.90
MOISTURE0.87