Supply Date25 Aug 2021
Contract NumberSAFAL/P/MN ORE/06.25/2021
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity29.87
Freight23.736
Loading Charges0
Offloading Charges0
Royalty7.04
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3040.05
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn50.08
Fe3.10
SiO29.05
Al2O31.85
P0.120
Size 0-10MM4.99
Size 10-20MM1.55
Size 20-100MM52.31
Size +100MM41.15
MOISTURE0.87