Supply Date22 Aug 2021
Contract NumberSAFAL/P/MN ORE/06.25/2021
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity30.57
Freight23.736
Loading Charges0
Offloading Charges0
Royalty7.04
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3111.29
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn49.97
Fe2.89
SiO27.69
Al2O33.84
P0.130
Size 0-10MM3.66
Size 10-20MM2.75
Size 20-100MM49.36
Size +100MM44.23
MOISTURE0.90