Supply Date28 Jul 2021
Contract NumberSAFAL/P/MN ORE/07.63/2020
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine (36-38%) 2
Deviance0
Inward Quantity33.77
Freight8.867
Loading Charges-2.5
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1599.58
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.05
Fe3.93
SiO214.14
Al2O35.78
P0.180
Size 0-10MM40.27
Size 10-20MM59.73
Size 20-100MM0
Size +100MM0
MOISTURE5.18