Supply Date24 Jul 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity32.205
Freight16.849
Loading Charges0
Offloading Charges0
Royalty6.6
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3685.83
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn51.64
Fe1.14
SiO28.78
Al2O33.77
P0.115
Size 0-10MM3.08
Size 10-20MM1.70
Size 20-100MM54.04
Size +100MM41.18
MOISTURE4.62