Supply Date31 Oct 2019
Contract NumberOS/MN ORE/37/2019
ItemManganese Ore
Supplier NameEmmanuel Chilumba
Grade (%)Low (32% - 38%)
Lot NumberEmmanuel Chilumba Mn ore LG
Deviance0
Inward Quantity52.257
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1871.7
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Mn29.06
Fe17.27
SiO27.68
Al2O35.3
P0.19
Size 0-10MM10-100mm