Raw Material Inward
| Supply Date | 24 Jul 2021 |
|---|---|
| Contract Number | SAFAL/P/STEAM COAL/07.07/2021 |
| Item | Steam Coal |
| Supplier Name | Maamba Energy Limited |
| Grade (%) | N/A |
| Lot Number | Maamba Collieries- 10-35 (nut's) |
| Deviance | 0 |
| Inward Quantity | 31.5 |
| Freight | 36.358 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 0.937 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 3757.79 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |