Supply Date31 Oct 2019
Contract NumberOS/MN ORE/36/2019
ItemManganese Ore
Supplier NameElizabeth Chipika
Grade (%)Low (32% - 38%)
Lot NumberElizabeth Chilima Mn Ore- LG
Deviance0
Inward Quantity20.127
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost757.29
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
Mn30.5
Fe22.6
SiO24.15
Al2O33.85
P0.22
Size 0-10MM10-100mm