Supply Date07 Jul 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity35.96
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1474.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn33.87
Fe3.28
SiO217.55
Al2O36.44
P0.180
Size 0-10MM19.02
Size 10-20MM10.45
Size 20-100MM69.48
Size +100MM1.05
MOISTURE1.34