Raw Material Inward
| Supply Date | 02 Jul 2021 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/07.29/2021 |
| Item | Manganese Ore |
| Supplier Name | Debansy Engineering Ltd |
| Grade (%) | Ultra Low (Below 32%) |
| Lot Number | Debansy Engineering Mn Ore LG |
| Deviance | 0 |
| Inward Quantity | 39.02 |
| Freight | 0 |
| Loading Charges | 0 |
| Offloading Charges | 0 |
| Royalty | 0 |
| Other Cost | 1 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 1599.82 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |