Supply Date02 Jul 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity39.02
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1599.82
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.84
Fe2.46
SiO215.75
Al2O35.86
P0.185
Size 0-10MM12.68
Size 10-20MM8.75
Size 20-100MM44.10
Size +100MM34.47
MOISTURE1.26