Supply Date31 Oct 2019
Contract NumberOS/MN ORE/35/2019
ItemManganese Ore
Supplier NameCheng Ming
Grade (%)Low (32% - 38%)
Lot NumberCheng Mining - Mn ore
Deviance0
Inward Quantity22.5
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost933.95
Conversion Rate (Please insert 1 if no conversion is required)13.19
Inward StatusAccepted

Raw Material Test

Showing 1-12 of 12 items.
Raw Material ComponentValue
Mn33.5
Fe9.75
SiO27.7
Al2O35.45
P0.31
Size 0-10MM10-200mm
Mn33.5
Fe9.75
SiO27.7
Al2O35.45
P0.31
Size 0-10MM10-200mm