Supply Date30 Jun 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity42.575
Freight9.81
Loading Charges0
Offloading Charges0
Royalty2.97
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2289.68
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.95
Fe2.86
SiO215.05
Al2O35.88
P0.190
Size 0-10MM13.75
Size 10-20MM9.41
Size 20-100MM29.99
Size +100MM46.85
MOISTURE1.40