Supply Date29 Jun 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity40.715
Freight9.81
Loading Charges0
Offloading Charges0
Royalty3.13
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2196.17
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.85
Fe2.82
SiO214.91
Al2O36.38
P0.190
Size 0-10MM9.54
Size 10-20MM6.76
Size 20-100MM55.00
Size +100MM28.70
MOISTURE1.54