Supply Date26 Jun 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity39.055
Freight9.81
Loading Charges0
Offloading Charges0
Royalty3.09
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2105.06
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.65
Fe2.57
SiO215.02
Al2O35.78
P0.190
Size 0-10MM11.18
Size 10-20MM6.44
Size 20-100MM27.06
Size +100MM55.32
MOISTURE1.46