Supply Date24 Jun 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity42.145
Freight9.81
Loading Charges0
Offloading Charges0
Royalty2.84
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2261.08
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn35.12
Fe2.68
SiO218.40
Al2O35.90
P0.180
Size 0-10MM11.80
Size 10-20MM7.28
Size 20-100MM32.57
Size +100MM48.35
MOISTURE4.77